Building Permit Checklist
BUILDING PERMIT CHECKLIST
All applications must be filled out in full. Residential applications will be issued or denied within 10 working days. Multi-residential or commercial applications will be issued or denied with 30 working days.
- Proof of ownership
- Entrance Permit
- Water source (well report)
- Site Drawing (including setbacks, MDS reports, CA approvals)
- Completed Application
- Signed Schedule 1
- Stamped Engineers/Architects Drawings
- Construction drawings (to scale) to include;
- Foundation plans
- Floor plans
- Reflected ceiling plan
- Roof plan
- Building sections
- Wall sections
- Engineered systems designs
- Construction drawings (to scale) to include;
- Septic Design Completed Schedule 2 signed
- Energy Efficiency Design Considerations
- SB-12 Performance
- Designer taking responsibility for design
- Energy Star
- Software design package
- Designer taking responsibility for design
- Certificate from MNR, software company
- EnerGuide 80
- Software design package
- Designer taking responsibility for design
- Certificate from MNR, software company
- Duct Design
- Software design package
- Designer taking responsibility for design
- Certificate from MNR, software company
- Plumbing design (As per CBO’s request)
- SB-12 Performance